Details: .
- SECTION 05 – SAFETY
- Group 05 – Safety Measures
- SECTION 10 – GENERAL INFORMATION
- Group 05 – Specifications
- Group 10 – Tune-Up
- Group 15 – Predelivery Inspection
- SECTION 20 – ENGINE
- Group 00 – Engine Removal and Installation
- SECTION 30 – FUEL, AIR INTAKE, COOLING AND EXHAUST SYSTEMS
- Group 05 – Speed Control Linkage
- Group 10 – Fuel System
- Group 15 – Air Intake System
- Group 20 – Cooling System
- Group 25 – Cold-Weather Starting Aids
- Group 30 – Exhaust System
- SECTION 40 – ELECTRICAL SYSTEM
- Group 05 – Connectors
- Group 10 – Wiring Harness Routing
- Group 15 – Charging Circuit
- Group 20 – Starting Circuit
- Group 25 – Fuses, Relays and Switches
- Group 30 – Monitoring Systems
- Group 35 – Auxiliary Lighting and Electrical Components
- SECTION 50 – SYNCROPLUS TRANSMISSION
- Group 00 – Removal and Installation of Transmission Components
- Group 05 – Transmission Shift Controls
- Group 10 – Perma Clutch II
- Group 15 – Gear Transmission
- PSECTION 51 – OWER REVERSER
- Group 00 – Removal and Installation of Transmission Components
- Group 05 – Transmission Shift Controls
- Group 10 – Power Reverser Module
- Group 15 – Gear Transmission
- Group 20 – Range Transmission
- SECTION 56 – DRIVE SYSTEMS (except transmission)
- Group 00 – Component Removal and Installation
- Group 15 – U-Jointed Shafts and Torsion Damper
- Group 10 – Front-Wheel Drive Clutch
- Group 15 – Differential
- Group 20 – Hydraulic Pump Drive
- Group 25 – Final Drives
- Group 30 – Rear PTO Options
- Group 35 – Front Implement Drive
- SECTION 60 – STEERING AND BRAKES
- Group 05 – Hydrostatic Steering
- Group 10 – Steering Cylinders
- Group 15 – Brake Valve
- Group 20 – Rear Brakes
- Group 25 – Handbrake
- Group 30 – Hydraulic Trailer Brake
- SECTION 70 – HYDRAULIC SYSTEM
- Group 05 – Controls
- Group 10 – Hydraulic Pump
- Group 15 – Valves
- Group 20 – Rockshaft, Lift Cylinders and Center Link Support
- Group 35 – Selective Control Valves and Couplers
- SECTION 80 – MISCELLANEOUS
- Group 00 – Component Removal and Installation
- Group 05 – Main Frame
- Group 10 – Front Axle
- Group 15 – Front and Rear Wheels
- Group 20 – Center Link Bracket and Swinging Drawbar
- SECTION 90 – OPERATOR’S STATION
- Group 00 – Removal and Installation of Operator’s Station
- Group 05 – Controls and Instruments
- Group 10 – Operator’s Seat
- Group 15 – 2-Post ROPS
- SECTION 99 – SPECIAL TOOLS (Dealer-Fabricated)
- Group 05 – Special Tools (Dealer-Fabricated)